Paraguard expansion joint roof to roof with parasolo flashing.
Parapet wall roof to wall flashing detail.
Flashing over rooang fascia sheatiiing 2 x 4 sleepers aligned w rafters provide.
6 interior wall treatments concrete masonry walls with an interior treatment may also utilize a through wall flashing installation of flashings as shown in figure 9.
Exterior wall parapet rafters prep.
High wall flashing detail 5 wide sheets.
Where no structural damage has occurred and the cladding is sound the parapet should be cap flashed as shown below.
Copper base flashing which extends at least 8 up the wall.
Roof to wall and deck to wall flashing www fema gov technical fact sheet no.
23 roof to wall and deck to wall flashing home builder s guide to coastal construction page 1 of 3 purpose.
Parapet with paraguard coping and parasolo flashing.
No vapor control layer and thermal bridging everywhere.
To install the roof wall flashing above the builder bent the top edge of the flashing into a 90 degree lip about 2 cm in width.
And to make matters worse structurally we also tend to have some issues.
Roof area divider curb type.
The saddle flashing shall be set in two continuous beads of sealant.
Detail drawing dwg dwg 425 kb en.
High wall flashing detail 10 wide sheets.
To wall sloped roof no overhang ledger support.
Detail drawing pdf pdf 187 kb en thru wall counterflashing.
Parapet wall with edge grip.
To emphasize the importance of proper roof and deck flashing and to provide typical and enhanced flashing techniques for coastal homes.
No air control in either the roof assembly or the wall assembly.
Skylight roof hatch flashing.
Flashing under e2 as1 all parapets must be flashed with a cap flashing having a 5 cross fall to prevent water accumulation.
A bead of continuous sealant shall be applied at the top of the counterflashing and the seams of the sheet metal saddle flashing.
No membrane under the parapet flashing.
The counterflashing laps the base flashing a minimum of 3.
Wall base termination detail.
Paraguard expansion joint roof to wall with parasolo flashing.
A prefabricated sheet metal saddle flashing is applied at the junction of the structural wall and parapet wall to terminate exposed openings.
The roofing squares are locked into a 20 oz.
Air leakage into and out of everything and everywhere.
This detail shows a flashing condition at a vertical wall or parapet.
Figure 8 flashing single wythe walls at roof parapet intersection ref.